Road King Diamond Flex Savings Estimator – Kennametal

These calculations are based upon theoretical values and are only intended for planning purposes. Actual results will vary. No responsibility from Kennametal is assumed.

Baseline Carbide Tooling Information
Metric
Inch

Baseline Carbide Tooling Information

Days
Hours
Stops
If no stops are taken to spot in tools during the workday, enter 0 for the number and length of time for of stops.
Minutes
Baseline Polycrystalline Diamond (PCD) Tooling Information

Baseline Polycrystalline Diamond (PCD) Tooling Information

If unsure of how long between Road King Diamond Flex maintenance cycles or the length of time of a maintenance cycle, contact your Kennametal Sales Representative or enter our averages of 4 days and 2 hours.In some applications outside of road milling, no maintenance cycles are required. If this is the case, enter 0 hours and any non 0 number of days.
Days
Hours
Business Information

Business Information

If this information is not known, enter 0 to show the time saving outputs.
$/hour
If this information is not known, enter 0 to show the time saving outputs.
sqyd/daysqm/day
$/sqyd$/sqm
Weeks
Days
Hours
$/hour
Trucks
$/hour
Your Potential Savings

Your Potential Savings

Hours/day
$/day
Days/year
$/year
sqyd/yearsqm/year
$/year
Está a punto de añadir a su página Mis soluciones. ¿Desea continuar?
Select the destination where you want to move a.
Nuevo Folder
    • Applied Filters:
    • Clear All

product-image
Please adjust the following properties from

ISO catálogo

ANSI catálogo

to find similar products.

The following files are available

Please select a file to download

Models

Product data

Debe iniciar sesión para ver la información de su panel de control
Session expired due to inactivity, please login again
El/los producto/s () que estaba intentando añadir al carrito no está/están disponibles Contacto del servicio de atención al cliente.
artículo(s) añadido(s) correctamente al carrito
View Cart

. Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

Minimum quantity should be

SAP Material Number ISO catálogo Grade  

You are about to leave the Solution building process.

Are you sure you want to leave?

Standard

ALL

Material

Select a Value

Hardness

--

Hardness Scale

--

Permitted Groups :

Group

SubGroup

Hardness (HB)

Hardness (HRC)