Z-Axis Milling Force, Torque, & Power Calculator – Kennametal

These calculations are based upon theoretical values and are only intended for planning purposes. Actual results will vary. No responsibility from Kennametal is assumed.

Baseline Carbide Tooling Information
Metric
Inch

Conversion of Workpiece Material Rockwell (Optional)

Skip this step if you already know the Brinell hardness number(HB)
Characteristics of Workpiece Materials

Characteristics of Workpiece Materials

HB
PSI N/mm 2
Ultimate Strength shown for generic steel. Please enter the actual value of your workpiece material if available, for better accuracy You may look up this info through websites such as www.matweb.com
Z axis Mill Nomenclature

Z axis Mill Nomenclature

inmm
Machining Conditions

Machining Conditions

sfm m/min
in mm
in. IPT (chip load) mm
Machinability factors
Most Common
Workpiece Materials
Cm at W/D ratios:
W/D < = 0.660.66 < W/D < 1.0W/D = 1.0
Aluminum alloys1.01.051.1
Carbon and alloy steels1.01.151.3
Cast irons1.01.151.3
Titanium alloys1.01.201.4
Stainless steel, High-temperature alloys2.02.152.3
Machine Tool Efficiency factors
Direct Belt Drive.9
Back Gear Drive.75
Geared Head Drive.7-.8
Oil - Hydraulic Drive.6-.7
Calculated Machining Conditions

CalculatedMachiningConditions.heading.label

RPM
IPM (no productivity formula)mm/min (no productivity formula)
MRRcm3/min
in.2mm2
Calculated Required Power

Calculated Required Power

HPckW
hpkW
You are about to add to your My Solutions page. Do you want to proceed?
product-image
Please adjust the following properties from

ISO Catalog Number

ANSI Catalog Number

to find similar products.

The following files are available

Please select a file to download

Models

Product data

You should be logged to see your dashboard information
Session expired due to inactivity, please login again
The product/s () you were trying to add to the cart is/are not available, please contact customer service
item(s) successfully added to the cart
View Cart

. Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

Minimum quantity should be

SAP Material NumberISO Catalog NumberGrade  

You are about to leave the Solution building process.

Are you sure you want to leave?