ToolBOSS Benefits and Shared Rewards

REDUCED SUPPLY COSTS

Oil Equipment Manager

Slashed monthly glove usage by 200 pairs.

Pump Manufacturer

Staff moved to more valuable roles

The installation of 20 ToolBOSS units enabled 12 tool crib staff to be redeployed to higher-value-added roles.

Small Parts Manufacturer

Monthly spend reduced by 30%

Dispensed single inserts versus packages of inserts.

LESS STOCK

Aerospace Manufacturer

Decreased inventory by 80% from $750,000 to $130,000

Integrated Supplier

Reduced consignment stock by 50%

Small Parts Manufacturer

Reduced issue time from 30 minutes to 18 seconds

How does it work?

  • Kennametal will baseline the prior 12 months sales with the customer.
  • A growth value is calculated on the value of the equipment and services purchased in that 12-month period.
  • We provide an agreement for the customer to increase spend on Kennametal product in exchange for free use of ToolBOSS.
  • During the term of the agreement Kennametal will provide all repair parts, technical support and software upgrades to the equipment.
  • At the end of the contract term the agreement can be renewed and the support will continue.
Si sta per aggiungere alla pagina Le mie soluzioni. Continuare?
Select the destination where you want to move a.
Novità Folder
    • Applied Filters:
    • Clear All

product-image
Please adjust the following properties from

ISO Catalogo

ANSI Catalogo

to find similar products.

The following files are available

Please select a file to download

Models

Product data

Per visualizzare le informazioni sul dashboard è necessario eseguire l’accesso
Session expired due to inactivity, please login again
Il prodotto/prodotti () che si sta/stanno tentando di aggiungere al carrello non è/sono disponibile/i contattare il Servizio clienti.
articolo/i aggiunto/i correttamente al carrello
View Cart

. Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

Minimum quantity should be

SAP Material NumberISO CatalogoGrade  

You are about to leave the Solution building process.

Are you sure you want to leave?