How can NOVO help me find the best tools?

Every new machining job begins with a challenge, and questions: “I need a ½” by 5xD solid carbide drill in grade KC7315.”

  • How long will it take, and how much will it cost?
  • What are the best tools to use, and do I have them in stock?
  • What’s the best approach?

NOVO helps you find and select the tools you need for any machining job.

Tools can be selected from your current shop inventory, or any available source (in stock or purchased).

 

 

 

How To: Create an assembly and download a tool assembly model.

 

 

 

 

Why Is It Faster?

Case Study:

A job shop planned to retrofit an old lathe machine with a new turret. This machine typically handled two to three different types of small lug machining jobs. Time was of the essence. A Kennametal rep visited the shop and recommended the KM quick-change tooling system. The job shop owner requested the new tooling proposal be prepared in one day so he had time to review it and decide whether to go with our solution or a competitor's.

Creating the quote usually would take 1 to 2 days, and involve gathering information from multiple catalogs and creating the assembly drawing.

We used the NOVO app at the owner's shop floor and created a solution in only three hours. We improved our quoting efficiency from a day or more to only three hours. By achieving such fast results, the owner chose Kennametal's solution. He is now retrofitting the machine turret with KM tooling and is back to production faster with the latest technology.

NOVO Tool Suggestions in Only Three Hours with Kennametal Tool
マイソリューションページにを追加しようとしています. 続行しますか?
product-image
Please adjust the following properties from

ISO製品型番

ANSI製品型番

to find similar products.

The following files are available

Please select a file to download

Models

Product data

ダッシュボード情報を表示するには、ログインする必要があります
Session expired due to inactivity, please login again
カートに追加しようとした製品()はありません カスタマーサービスにお問い合わせください。
アイテムがカートに正常に追加されました
カートを表示

. Please enter the desired qty for the material(s) you want to include in your promotion or Proceed Without Promotion and only your base materials will be added to the cart.

Minimum quantity should be

SAP Material NumberISO製品型番材種  

You are about to leave the Solution building process.

Are you sure you want to leave?